Agenda Item #32


Title
APPROVAL OF AMENDMENT #4 WITH HARVARD JOLLY ARCHITECTURE FOR THE SARASOTA HIGH SCHOOL RENOVATION AND NEW CONSTRUCTION PROJECT

Description

The scope of work for this amendment shall include additional services work associated with: Task #1 - Incorporate changes to the Media Center after reviewing functionality with School Staff. These changes include enlarging the text book storage room, eliminating small study rooms and creating collaborative study areas and changing the layout of the "virtual" school computer area.  Task 2 - Incorporate changes necessary to swap the TEL Studio and the TV Production classroom and studio on the second floor of Building #1.  These changes include modifications to the infrastructure to accommodate the change of space along with creating a "control room" for the TV Studio portion of the classroom space.  Task 3 - Design a new water supply feed to Building #1 to be permitted through the City of Sarasota.  This new supply feed was required because of the location of the existing meter would have been in a drive aisle and the existing water line was found to be unrestrained and in conflict with the new fire line installation.



Recommendation
That Amendment #4 to the Agreement dated May 1, 2012 with Harvard Jolly Architecture for the Sarasota High School Renovation and New Construction project be approved as presented.

Contact
LEMPE & SMITH

Financial Impact
Capital:  $20,900.00


Attachment:  BAIenc10-6-2015_ArchAmend4-SHS-Renov&NewConst.pdf